🇲🇾 Malaysia (MY)

Supply chain footprint — snapshot year 2025

← Atlas index

5Elements mined
12Elements refined
0Top-3 reserves
14Critical elements

Mining (5 elements)

Element Share % Quantity Global rank Confidence Notes
Si
silicon
2.5% 130,000 tonnes per year 8th high USGS 2024e: 130 kt (up from 91 kt in 2023).
Mn
manganese
2.0% 410,000 tonnes per year 8th high USGS MCS 2025: Malaysia 410 thousand metric tons 2024e.
Sn
tin
1.0% 3,000 tonnes per year 12th high USGS MCS 2025 table: Malaysia 3,000 metric tons (estimated) 2024e, down from 3,770 in 2023.
Ca
calcium
0.4% 1.5 million tonnes per year 16th high USGS MCS 2025 table: Malaysia 2024e = 1,500 thousand metric tons.
Ce
cerium
0.0% 130 tonnes per year 11th high USGS MCS 2025: Malaysia 130 t REO (2024e), down from 310 t in 2023.

Refining (12 elements)

Element Share % Quantity Global rank Confidence Notes
Ce
cerium
13.0% 2nd medium USGS MCS 2025: Malaysia supplied 13% of US rare-earth imports (2020–23). Lynas Rare Earths operates the world's largest …
Eu
europium
7.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate and produces…
Pr
praseodymium
7.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate producing se…
Gd
gadolinium
7.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Mt. Weld (Australia) concentrate through sol…
Tm
thulium
7.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Mt. Weld (Australia) concentrate through sol…
Sm
samarium
7.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate producing se…
Dy
dysprosium
5.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate into separat…
Ho
holmium
5.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate into separat…
Er
erbium
5.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate and produces…
Yb
ytterbium
5.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate and produces…
Tb
terbium
4.0% 2nd high Lynas Advanced Materials Plant (LAMP) in Gebeng, Pahang, Malaysia processes Australian Mt. Weld concentrate and produces…
Al
aluminum
1.2% 0.9 million tonnes per year 17th high Malaysia. USGS 2024e: 870 kt; yearend capacity 1,080 kt.

Reserves (0 elements)

No attributed data for this stage.